| Task |
Status |
| Initial Operation |
Completed |
| Acceptance
Test |
Completed |
| Mapping of
Dual Opposed Convertors |
Completed
(Data Online) |
| Insulation
Thermal Loss Test |
Completed |
| Calibrate
Piston Position Transducers |
Completed |
| Dual Opposed
Test With Variable Piston Stroke |
Completed
(Data Online) |
Microgravity
Emissions Lab (MEL) Vibration Test
(Test Description) |
Completed |
| Modal Vibration
Test of The Linear Alternator |
Completed |
| Single Convertor Mapping with Digital Resistive Load Controller |
Completed |
| Vibration
Test In an Engineering Mounting Structure |
Ongoing |
| Test With
Low EMI Controller |
Ongoing |